Join the 155,000+ IMP followers

railway-usa.com
Rail Baltica News

The first environmental impact assessment report of Rail Baltica main route in Estonia was declared to meet the requirements

The Consumer Protection and Technical Regulatory Authority declared the environmental impact assessment (EIA) report of the Ülemiste-Kangru section of Rail Baltica to be compliant with the requirements.

The first environmental impact assessment report of Rail Baltica main route in Estonia was declared to meet the requirements

The recognition of the EIA report as meeting the requirements will soon allow the construction of the first section of the main railway line to begin.

The route section running from the Ülemiste terminal to Kangru township is 15.8 kilometers long, and the railway corridor runs there mainly between business and production areas, and between promising compact built-up areas. There are no large forest areas, agricultural areas or land units in the area, and there are no Natura 2000 areas within the influence area of the railway.

According to Rail Baltic Estonia’s environmental manager Roland Müür, all possible significant environmental impacts based on the conclusions of the environmental impact assessment are either avoided, mitigated to an insignificant degree or compensable. “When it comes to various measures, for example, in order to reduce railway noise, various noise barrier solutions will be built on the section for nearly three kilometers – wooden or metal noise barrier walls and earth embankments. In order to ensure the movement of fauna, one eco-duct is planned for the section, as well as an underpass suitable for big game, sixteen culverts and tunnels for small animals. In addition, green strips will be built on the edge of three viaducts crossing the railway,” Müür listed.

The environmental impact assessment report also sets important conditions for carrying out construction activities – to protect the bird population, the forest along the route will be cut down outside the birds’ breeding season, and if necessary, time restrictions will also be applied to construction activities. In addition, the water level and quality of the wells that remain in the affected area during construction activities must be ensured, and construction materials must be transported and stored in a way that minimizes the spread of dust.

The implementation of the measures and the effectiveness of the measures will be monitored by mandatory monitoring during the entire construction period as well as during the period of use of the future railway.

Considering the large number of environmental measures and the complexity of the project, Rail Baltic Estonia OÜ prepares a corresponding environmental management plan for the management of environmental measures for each section to be assessed. The environmental management plan shall include both the environmental measures made mandatory when the permit was issued, as well as the environmental measures set voluntarily by the developer. The environmental management plan is updated regularly (either once a year or more frequently according to the important developments of the project) by adding or specifying measures according to changes in environmental information or the development of other improved knowledge.

The environmental impact assessment of the Estonian part of Rail Baltica is carried out in parallel with the design of the main route. Important impact areas assessed by the EIA: wildlife, noise, energy use, cultural heritage, ambient air, surface water, groundwater, etc.

The initiation of the impact assessment was requested by the Estonian branch of RB Rail AS at the beginning of 2019 on its own initiative.

Rail Baltica is an environmentally friendly and convenient railway connection that connects Estonia with its southern neighbors and Central Europe. The infrastructure being built will allow passengers to reach Pärnu from Tallinn in 40 minutes and Riga in 1 hour and 42 minutes. Regional trains will also run on the Rail Baltica route.

Rail Baltic Estonia is the developer of the Rail Baltica railway in Estonia and in the future the infrastructure manager of the Estonian part of this railway.

www.railbaltica.org

  Ask For More Information…

LinkedIn
Pinterest

Join the 155,000+ IMP followers