High Speed Two (HS2) Limited, established in 2009 and headquartered in London, UK, is the company responsible for developing and promoting the UK's new high-speed rail network. HS2 aims to connect major cities across Britain, including London, Birmingham, Manchester, and Leeds, reducing travel times and increasing rail capacity. The project focuses on sustainability, aiming to deliver low-carbon travel options and support economic growth. HS2 represents one of the largest infrastructure projects in Europe, with a commitment to enhancing connectivity and supporting the UK's transition to a net-zero carbon economy.
HS2 have completed sheet piling work by contractors Skanska Costain STRABAG Railways Joint Venture (SCS Railways) in Acton, West London, to enable the construction of the Victoria Road Crossover Box.
Manchester-based civil engineering specialists P.P O’Connor Group Limited have joined the growing number of British businesses supporting construction of Britain’s new railway, High Speed Two.
The first freight train has arrived at HS2’s main construction compound in Buckinghamshire, as work continues to prepare for the start of construction across the central section of Britain’s new high-speed railway.
HS2’s first two giant Tunnel Boring Machines (TBMs) have arrived in the UK and will be ready to start work on the UK’s largest infrastructure project early next year.
PAS 2080 is a global specification for managing whole-life carbon in infrastructure. Developed by the Construction Leadership Council’s Green Construction Board with the British Standards Institute (BSI), it provides a consistent framework for evaluating and managing carbon across the whole infrastructure value chain.
The company delivering Britain’s new high speed rail network has today (Monday 9 November 2020) announced the names of the five new cutting-edge tech firms that will join HS2 Ltd’s Innovation Accelerator programme.
HS2 Ltd has revealed the final design for the Little Missenden vent shaft headhouse, which will provide ventilation and emergency access to the high-speed railway’s 10 mile-long Chilterns tunnel below.
The second of four bridges to be completed on the site of HS2’s new Interchange Station at the heart of the new high-speed network, this new bridge will carry the A452 and form part of a major remodelling of the local road network. This will improve the circulation of traffic around the UK’s new high-speed railway, integrating the existing network with the new Interchange Station.
Today (Thursday 22nd October), HS2 Ltd has released a new video highlighting how the additional capacity HS2 will create on Britain’s existing rail network will benefit UK ports and distribution centres that use rail freight for the movement of goods.