Transport for London (TfL) and Siemens Mobility have unveiled the detailed design of the new generation Tube trains for the Piccadilly line, which will soon be in production to replace the existing 1970s fleet.
In the second quarter of 2020, InfraLeuna awarded the Rhomberg Sersa Vossloh cooperative the contract to digitalize the rail infrastructure at its chemical complex in order to optimize its long-term, track system management.
The German distributor Acceed and the globally operating manufacturer Adlink are connected with a partnership which has already existed for several decades.
Hitachi Rail has successfully tested its first battery-powered tram in Florence – an important milestone towards expanding the firm’s offer to market the vehicles across the world.
From 1st March, we are doubling the frequency of our TransFER Trieste–Vienna–Linz–Trieste to two round trips a week and thus strengthening our direct connection to one of Europe’s most important ports.
In line with the recently awarded contract to implement a cable car solution for the Georgian capital Tbilisi, SYSTRA has been selected to carry out appraisal studies and preparation of a call for tenders for a new project.
Since august 2018, rail cantech, a canadian subsidiary of etf, has been installing rubber-tyred underground rail systems at the garage côte-vertu maintenance and storage centre, which is part of société des transports de montréal (stm). The stm is a public transit authority that operates a 68-kilometre underground rail network, which is north america’s fourth-longest, after the new york city subway, the mexico city metro, and the toronto subway. The project will continue until 2021.
Midlands-based construction firm, Collins Earthworks, has completed excavating the north portal site of Long Itchington Wood Tunnel, ready for the launch of the tunnel boring machine that will dig under the ancient woodland in Warwickshire.