Join the 155,000+ IMP followers

railway-usa.com
Robel News

Robel signs transport system deal with ARTC

The project will be delivered by Robel, working in close collaboration with the Australian-based wagon manufacturer Rail First Asset Management (RFAM).

Robel signs transport system deal with ARTC
The rail manipulators are center part of the two Robel rail exchange systems ordered by the Australian Track Corporation.

Australian Rail Track Corporation Ltd (ARTC) has ordered from Robel Bahnbaumaschinen GbmH two ROREXS rail exchange systems, one for the delivery of 50 rails and one for the delivery and recovery of 32 rails of 165 m length each.

Australian-based wagon manufacturer Rail First Asset Management (RFAM) will provide 36 specially adapted container flat wagons onto which Robel is going to install the specialist on board equipment.

For this project, Robel introduces the latest technology in rail clamping, roller support gates and chute system, which integrates full automation and remote control. This eliminates working at height and close proximity to moving rail and increases production rates whilst maintaining optimum rail condition at all times during the process.


Robel signs transport system deal with ARTC
The ROREXS systems will be deployed by ARTS for the delivery of 50 rails and the delivery and recovery of 32 rails of 165 m length each.

Michael Seeleithner, Sales Director Robel Systems & Vehicles: “We are proud to be part of this tripartite agreement with ARTC and Rail First. By introducing our latest technology for rail delivery and recovery, we aim to support ARTC optimize safety, efficiency and quality in the management of rail handling across the Australian network.”

Clinton Crump, General Manager Asset Strategy & National Plant ARTC: “Re-railing is a critical activity delivering safety and reliability outcomes on our rail network. The proposed procurement of new rail rakes from Robel and Rail First provides value for money, continuity of supply and critically offers the safest available solution to support the distribution of rail required for ARTC’s sustaining rerailing program.”

The new transport systems will start delivery of new rail from Bathurst and Port Augusta Rail welding depots and scrap rail recovery throughout the 8,500 km ARTC standard gauge network in spring 2025.

More about Robel Rail Exchange Systems

www.robel.com

  Ask For More Information…

LinkedIn
Pinterest

Join the 155,000+ IMP followers